Public Notice
Organization
Town of Lakeville
Date Published
08/26/2026
Date Expires
10/31/2026
Notice Info
Starting the FIRST WEEK of September 2026 construction crews from Emery Lee will begin work on the replacement of the DILL BROOK water crossing on the DEPOT ROAD in the Town of Lakeville. It is expected the work will complete by October 31, 2026. During the construction period there will be a single lane bypass with a maximum load width of eleven (11) feet. Drivers traveling onto the Depot Road from the Bottle Lake Road should be especially careful due to the presence of construction equipment and materials staged at the intersection of the roads.